MAEKO posting calendar

12–30 October 2026 · 3 LinkedIn + 3 Instagram/Facebook posts a week, as agreed (12 + 12 a month, plus 1 LinkedIn article). Checked against Instagram, Facebook and LinkedIn on 8 Oct 2026, 3:50pm (re-planned 5:50pm; Mon 19 Instagram updated 9 Oct). Instagram posts copy to Facebook on their own (seen on every post so far).

24live so far (16 Instagram + Facebook, 8 LinkedIn)
17on this calendar
11ready to schedule
5ready, one thing to check
1waiting on something

Add the dates to your calendar (.ics)

The two weeks at a glance

Tap a post to jump to its files and caption.ReadyReady, check firstWaiting

Mon 12 OctWed 14 OctFri 16 Oct
LinkedIn
9:00am
80% less volume. Now ask how your collector charges.The Prime Minister visited the MAEKO booth at MAHA 2026MAEKO is now a Certified B Corporation
Instagram + Facebook
12:30pm
Does it smell?Scraps in, compost outWorld Food Day: back to the soil
Mon 19 OctWed 21 OctThu 22 OctFri 23 Oct
LinkedIn
9:00am
Food waste, in your ESG report. Here is how.What if your food waste never waited for the truck?Food waste cost per tonne, Malaysian hotel: what it really adds up to (article)~73 kg a day, for 81 days
Instagram + Facebook
12:30pm
MAEKO Academy: your staff do it with their own handsBones do not go in a blender. (video)·"This has reduced our haulage cost."
Mon 26 OctWed 28 OctFri 30 Oct
LinkedIn
9:00am
Keep your collector. Cut the trips.Your report needs a food-waste number.See a MAEKO machine running at a real site.
Instagram + Facebook
12:30pm
ESG Excellence Award, Sin Chew Business Excellence Awards··

Every post, in order

Mon 12 Oct · 9:00amLinkedInReady

80% less volume. Now ask how your collector charges.

Add the photo, paste the text.

Caption
Cutting your food waste volume does not cut your collector's bill. Not on its own.

Most commercial kitchens pay their collector a flat monthly contract, not by the tonne. A MAEKO machine treats food waste on site in a 24-hour cycle and cuts its volume by up to approximately 80%. The saving lands when the collection changes: a smaller, less frequent pickup, renegotiated.

How is your collection charged today: per trip, per bin, or one monthly fee? Tell us below.

#FoodWasteMalaysia #Hospitality #HotelEngineering
Mon 12 Oct · 12:30pmInstagram + FacebookReady, check first

Does it smell?

The caption invites people to visit a running site. Confirm MAEKO has a site visitors can see (same as LinkedIn on Fri 30).

Caption
Our machines run inside hotel and restaurant back-of-house areas, next to the bins.

DM us to visit a running site and check for yourself.

#foodwaste #Malaysia #foodwastemachine #FandB #hotelkitchen
Wed 14 Oct · 9:00amLinkedInReady

The Prime Minister visited the MAEKO booth at MAHA 2026

Add all 4 photos in this order.

Caption
Thank you to everyone who visited the MAEKO booth at MAHA 2026, at MAEPS, Serdang.

Prime Minister YAB Dato' Seri Anwar Ibrahim stopped by, and Mae Ooi introduced him to MAEKO. YB Datuk Seri Haji Mohamad Sabu came by as well, and our team ran live demos at the booth.

MAEKO machines take a kitchen's daily food waste on site and turn it into a dry compost in a 24-hour cycle, with up to approximately 80% less volume to haul away.

Want to see one running in a hotel or restaurant back-of-house? Comment "MAEKO".

#MAHA2026 #FoodWasteMalaysia #Hospitality
Wed 14 Oct · 12:30pmInstagram + FacebookReady, check first

Scraps in, compost out

The caption wasn't shown on the approval board, so please read it once. This post replaces the older "One machine. On your site." design.

Caption
One change in your back-of-house: the machine takes the day's scraps instead of the bin bags.

You still need a collector, just a smaller, less frequent one. We build and service our machines in Malaysia ourselves.

DM us to find out more.

#foodwaste #Malaysia #foodwastemachine #FandB #circulareconomy
Fri 16 Oct · 9:00amLinkedInReady

MAEKO is now a Certified B Corporation

Add the photo, paste the text.

Caption
B Lab, the non-profit behind B Corp, has certified MAEKO.

For a sustainability team that matters in two places: the suppliers you report on, and the programmes you can stand behind. B Lab checked the whole company, not only what it sells: how it is run, and how it treats its workers, community, customers and the environment.

We have built food waste machines in Malaysia since 2011. Over 4 million kilograms of food waste processed, as reported by the UN Foundation, September 2019.

Building your 2027 sustainability plan? Comment "MAEKO" and we'll send the certification details.

#BCorp #ESG #FoodWasteMalaysia
Fri 16 Oct · 12:30pmInstagram + FacebookReady

World Food Day: back to the soil

Fixed date: 16 October is World Food Day.

Caption
Food that is wasted can still go back to the soil. 🌱

MAEKO machines treat food waste where it is made, in a 24-hour cycle, and turn it into a dry compost. This World Food Day, that is the part of the food chain we work on.

DM us to find out more.

#WorldFoodDay #foodwaste #compost #Malaysia #MAEKO
Mon 19 Oct · 9:00amLinkedInReady

Food waste, in your ESG report. Here is how.

Add a document and upload the PDF (5 pages). Title: Food waste in your ESG report.

Caption
How can food waste count in your company's ESG report? Three steps, with MAEKO.

Measure it: each load your kitchen puts into a MAEKO machine is recorded in our app.
Report it: the figures go to an ESG dashboard, and we can prepare an ESG report from them.
Disclose it: a food-waste figure from your own site, for Bursa's sustainability reporting, which is phasing companies in through 2027.

And your supplier is a certified B Corporation.

Planning your 2027 sustainability programme? Comment "MAEKO".

#ESG #Sustainability #FoodWasteMalaysia
Mon 19 Oct · 12:30pmInstagram + FacebookReady

MAEKO Academy: your staff do it with their own hands

Approved 9 Oct. Replaces the B Corp share on this day (it repeated LinkedIn Fri 16).

Add all 4 pictures in this order, then paste the text.

Caption
Real MAEKO Academy trainings 🌱
✅ Staff layer food scraps, shredded paper and dry leaves themselves
✅ They see how MAEKO's technology makes composting faster and easier
✅ They leave knowing how to compost food scraps at work
✅ The MunchBOT, a portable food waste composter, stays at your workplace after the course

A HRD Corp claimable course for your team. DM us to ask about a session.

#HRDCorp #foodwaste #compost #Malaysia #MAEKOAcademy
Wed 21 Oct · 9:00amLinkedInReady

What if your food waste never waited for the truck?

Add the photo, paste the text.

Caption
A MAEKO machine takes your kitchen's food scraps at close of service.

In a 24-hour cycle they become a dry compost, with up to approximately 80% less volume to haul.

It sits in the back-of-house, next to where the bins used to wait.

How many collections a week does your kitchen run now? Tell us below.

#FoodWasteMalaysia #HotelEngineering #Hospitality
Wed 21 Oct · 12:30pmInstagram + FacebookReady

Bones do not go in a blender. (video)

The same video you posted on LinkedIn on 8 Oct.

Post as a Reel.

Caption
Bones do not go in a blender.

Hotel and restaurant kitchens throw out bones and shells every day. MAEKO's HARDSTOCK machine has a crushing chamber, not a blade set, so they go in on site with the rest of the scraps. One 24-hour cycle later, they are a dry compost you can use, with up to approximately 80% less volume. Cutlery, plastic and packaging still come out first at the bin.

DM us to find out more.

#foodwaste #foodwastemachine #FandB #hospitality #Malaysia
Thu 22 Oct · 9:00amLinkedInReady, check first

Food waste cost per tonne, Malaysian hotel: what it really adds up to (article)

Text only

October's one LinkedIn article. Re-check the tax incentive (GITA) paragraph after the Budget on Fri 9 Oct before posting.

LinkedIn: Write article. Paste the title, then the text.

Article title
Food waste cost per tonne, Malaysian hotel: what it really adds up to
Article text
The number everyone quotes for the cost of food waste is the landfill gate fee at Jeram in Selangor: RM43.00 a tonne, set to rise to RM55.00 when the landfill's waste-to-energy plant comes online. Here is what the pitch decks leave out. That is the rate the local council pays the landfill. It is not the rate your kitchen pays, and it is not a line you will ever find on your own invoice.

Run that council rate across a year and a 400 kg-a-day kitchen sends out 146 tonnes (400 kg × 365 days), which at RM43.00 a tonne comes to about RM6,278. Treat that as a floor on one hidden line, not your bill: a commercial kitchen is billed more than the council rate, and the 400 kg is an assumption. Weigh your own kitchen for seven days before you trust any number in this article, including this one.

What does a hotel actually pay per tonne of food waste?

The RM43.00 a tonne is the council gate fee at the Jeram sanitary landfill in Selangor, effective 1 July 2023. It is set to rise to RM55.00 a tonne when the landfill's waste-to-energy plant comes online (Dewan Negeri Selangor records).

That is the number most people quote when they talk about the cost of food waste. It is not your number. Your food waste leaves through a private collector, a commercial kitchen is billed more than the council rate, and it reaches you as one bundled monthly price. So you cannot read your true cost per tonne off RM43. You can read only the direction it is heading, which is up.

Why can't you see this cost on one invoice?

Your contractor bundles the gate fee on your commercial waste, the haulage and the bin and skip rental into one monthly price. You cannot pull the gate fee out of that number, because your collector never separated it for you. Your chiller space and your team's hours never appear on any invoice at all.

That bundling is the constraint. Bin and skip rental is fixed every month whether the bin is full or not. Chiller space holds wet waste so it does not rot before the next pickup. Labour moves the waste three times over: kitchen to store, store to loading bay, then wash-down. The collection trips happen whether the bin is half full or overflowing. Not one of those lines arrives on your invoice with its own name, and every one of them is driven by the same thing: how much waste there is to move.

What actually changes once waste is treated on site?

An on-site machine does not remove the bill. It shrinks the volume that has to be stored, moved and collected, which shrinks every line that volume was driving.

MAEKO's published figures: a 24-hour treatment cycle, and up to approximately 80% less volume by the end of it. A smaller bin needs fewer pickups. Fewer pickups need less labour to load and less chiller space to hold. Less collection, not none, because the reduction is in volume, and your contractor still has to come for whatever remains.

MAEKO has manufactured and run on-site food waste treatment machines in Malaysia since 2011, treating over 4 million kilograms (UN Foundation, September 2019) that would otherwise have gone to landfill.

What is the tax incentive you may have heard about?

If someone told you the government simply hands back a slice of the purchase price, they got the mechanism wrong. It is a tax allowance against income, not money off the invoice, and it works out to a smaller share of the price than that pitch implies.

The full mechanism, stated once and in full: GITA Asset Tier 2 is an allowance of 60% of qualifying capital expenditure, set against up to 70% of statutory income. At the 24% corporate rate the full allowance is worth up to 14.4% of the price as a reduction in tax payable, not a discount on the invoice, and only to the extent the company has statutory income to absorb it; unabsorbed allowance carries forward. This is not tax advice. Confirm the position with your tax agent.

Three conditions apply together, not separately: MOF-approved, MGTC-verified, MyHIJAU-listed. The expenditure must be incurred by 31 December 2026.

There is also a proposal in Budget 2026 to raise this to 100% for MyHIJAU-recognised products made locally in Malaysia. It has not been gazetted and no commencement date has been announced. Treat it as upside if it happens, never as a number you can bank today.

What does on-site treatment not solve for you?

It cuts the volume of waste. We publish volume reduction. We do not publish a mass-reduction figure. What leaves the machine is a smaller, less frequent pickup, not an empty loading bay.

Two more honest limits worth stating before anyone signs anything. First, cutting waste volume by up to approximately 80% does not automatically cut a bundled monthly invoice by the same share; the saving only shows up on your bill once your contract is renegotiated to fewer or smaller pickups. If your contractor charges a flat monthly rate regardless of volume, ask them, in writing, what a smaller bin actually changes. Second, whatever comes out the other end still needs somewhere to go. A machine without a named place to send its output has swapped a waste problem for a storage problem, so confirm it before delivery, not after. MAEKO buys finished compost back, from 200 kg a trip in the Klang Valley.

How do you size a machine for your kitchen?

Start by weighing what you actually throw out, every day, for seven days, including your busiest banquet day.

Your average day and your peak day are different numbers. A vendor who only asks for one of them is sizing off the wrong one.

Before you sign with any vendor, ask them four things directly. What is the published throughput range for the product line you are buying, not a single model's marketing number? What happens to the output, and who has agreed in writing to take it? Is the specific unit you are buying currently listed in the MyHIJAU Directory, with the listing valid on the date you plan to incur the expenditure? And what does the vendor not publish, on energy draw, on oil and grease tolerance, on anything else that matters to your kitchen? A vendor who answers all four in writing is one you can put in front of your finance team without being embarrassed.

Comment "MAEKO" for more enquiries.
Fri 23 Oct · 9:00amLinkedInReady

~73 kg a day, for 81 days

Add the photo, paste the text.

Caption
Source: a Malaysian five-star resort, July to September 2019, independently reported.

What our machines do with that load: a 24-hour cycle, and up to approximately 80% less volume. We publish volume reduction. We do not publish a mass-reduction figure.

We build and service them in Malaysia ourselves.

How many kilos does your kitchen bin on its busiest day? Tell us below, or comment "MAEKO" and we'll work out the size you'd need with you.

#FoodWasteMalaysia #HotelEngineering #Hospitality
Fri 23 Oct · 12:30pmInstagram + FacebookWaiting

"This has reduced our haulage cost."

Needs MAEKO's OK to quote the convention centre's team (from MAEKO's 2019 video). If it doesn't come by Thu 22, leave this day empty.

Caption
"With the usage of MAEKO machine, we are able to compost our food waste in 24 hours and this has reduced our haulage cost to the landfills."

That is a convention centre's operations team, on a kitchen that serves 1,000 to 3,000 meals a day.

Run a hotel, convention or canteen kitchen? DM us to see one running.

#foodwaste #Malaysia #hospitality #MAEKO
Mon 26 Oct · 9:00amLinkedInReady

Keep your collector. Cut the trips.

Add the photo, paste the text.

Caption
"We already have a collector."

Good. You will still need one. A MAEKO machine treats food waste on site in a 24-hour cycle, and up to approximately 80% less volume means a smaller, less frequent collection, not none.

What changes is what sits in your bin room between pickups, and how many trips you pay for once the contract is renegotiated.

How often does your truck come now? Tell us below.

#FoodWasteMalaysia #Hospitality #FacilitiesManagement
Mon 26 Oct · 12:30pmInstagram + FacebookReady

ESG Excellence Award, Sin Chew Business Excellence Awards

Caption
MAEKO won the ESG Excellence Award at the Sin Chew Business Excellence Awards 2025. 🏆

The work behind it happens in hotel and restaurant back-of-house areas: food waste treated where it is made, in a 24-hour cycle.

Thank you to Sin Chew Daily and to every team that sorts its scraps with us. DM us to see one running.

#ESG #foodwaste #Malaysia #MAEKO
Wed 28 Oct · 9:00amLinkedInReady, check first

Your report needs a food-waste number.

The dashboard figure 16,368,723.70 kg can be read on the picture. Confirm with MAEKO that it is OK to show.

Caption
Your sustainability report needs a food-waste number. Most kitchens don't have one.

Bursa's sustainability reporting is phasing companies in through 2027. With a MAEKO system, the operator records each load in our app, the figures go to an ESG dashboard, and we can prepare an ESG report from them. The number comes from your own site, not an estimate.

Comment "MAEKO" and we'll show you a sample dashboard.

#ESG #Sustainability #FoodWasteMalaysia
Fri 30 Oct · 9:00amLinkedInReady, check first

See a MAEKO machine running at a real site.

Offers a site visit. Confirm with MAEKO which site visitors can be taken to.

Caption
We'll take you to a site where a MAEKO machine is running every day.

You'll see the kitchen's food waste go in, and dry compost come out after the 24-hour cycle. Tell us roughly how much food waste your kitchen throws away a day, and we'll tell you which machine size fits.

Comment "MAEKO" or message us to book a visit.

#FoodWasteMalaysia #Hospitality #HotelEngineering

Not on the calendar

1 in 5 of all food is thrown away November

Approved. Moved to November to keep October at 12 Instagram + Facebook posts.

Thank you, ScaleX and MAHA 2026 (2 slides) November

Approved. Moved to November to keep October at 12 Instagram + Facebook posts. The least time-bound of the set.

Not made yet
IGEM 2026: the 3 questions buyers asked us (LinkedIn) Dropped

Not made. Dropped to keep LinkedIn at 3 posts a week.

4 things about your leftovers (video) Needs a fix

Needs a fix first: two numbers on screen don't match the 15 Sep post. Once fixed, it can go in November.

Company version of the ESG post (4 real companies) Waiting

Waiting for MAEKO's OK to name the four companies. The faces are already swapped. If the OK comes, it can replace the Mon 19 LinkedIn post.

Not made yet
Founder post (LinkedIn) Waiting

Waiting for Chelsea's answers to the founder questions (asked 29 Sep). Not made yet.

IGEM 2026 carousel Out of date

Approved, but the event ends Fri 9 Oct and slide 3 is about the 8 Oct talk, so it is out of date. The IGEM poster went out on 4 Oct instead.

MAEKO is now a Certified B Corporation (Instagram share) Replaced

Replaced on Mon 19 by the MAEKO Academy carousel (approved 9 Oct): the same picture already goes on LinkedIn on Fri 16.

"One machine. On your site." Replaced

Replaced by "Scraps in, compost out" on Wed 14, which is its redesign.

"The loop closes on site" Dropped

Same idea and caption as the 19 Sep post "Today's scraps, tomorrow's soil".

"5 things your leftovers can become" (video) on LinkedIn Optional

Optional extra. It is live on Instagram and Facebook (2 Oct). Jev rates it 0.58 for LinkedIn buyers: fine, not strong. Not needed: LinkedIn is at its 12 for October.

Already live

Our posts only. 4 more on Instagram and Facebook since 9 Sep were MAEKO's own (Shopee Live, payday sale, tax relief, a hiring post).

LinkedIn has "The real cost of food waste" twice on 5 Oct (12:30pm and 12:35pm, same text and slides). Delete the 12:35pm copy.

Instagram + Facebook

LinkedIn

The 30 Sep posting board is kept here.